Eng. Salah Hanoun Abu Al-Hill, Director of Qurna Municipality, continued the work of the gravel bedding in Al-Furat Street, which is 3 km long, in order to prepare the works for the tiling and the implementation of engineering and technical cadres in the municipality. From the Al-Furat Stadium near the Umma Park through the Qurna Iron Bridge and ending with the Tubular Bridge. The aim of the project is to establish the Euphrates River Corniche and to ease traffic congestion within the judicial center.